Monday, 12 March 2012

Floor Progress

Im quite enjoying the change of scenery that these wide caramel coloured boards are providing. It almost wants to make me keep them natural, but I can save that for my next project! Interestingly, as you can see in the photo comparison, the darker colour makes the room appear slightly shorter, while the light paint makes the floor recede, thereby visually increasing the ceiling height.

Sunday, 11 March 2012

A bit of perspective

Its been two days since my slight frustration on Friday evening with the installation and time has given me a bit of perspective. After 2 days of chopping down the waste wood into small pieces, dusting the flat, scrubbing the floors, and re-touching up all the woodwork in the hallway I can now see the forest through the trees. Overall, the floor looks great. The boards have loads of character and texture and look really brilliant running all the way through my hallway to the kitchen. I spoke with the carpenter and he is going to come back on Tuesday morning to sort out the dodgey corner.

I'll post progress photos tomorrow, but for now enjoy the evening sun touched rooftops opposite

.

Saturday, 10 March 2012

A sloppy third day of Installation

Argh. Im feeling really frustrated with the poor quality of work on the final day of the installation. I was pleased with the hallway so felt confident the rest would be good, but I think the carpenter just got bored or lazy!

For example, there is a big gap at the end of one board (top photo). I cant get him to replace the board with a longer one as I dont have any more, so will have to fill the gap with 2-part filler I guess.

Additionally, he didnt bother to take out the boards fully in one corner - leaving a sliver old of board which I find looks really sloppy (second photo). I guess when they are all painted white it will be less noticeable....

In addition to poor quality, however - he also left the flat in a total mess; dirty finger prints all over the walls and doors (I'll need to repaint), dust everywhere (he didnt even hoover the floor), and a huge pile of rubbish and boards to dispose of. Grrr.

Looks like I have a busy day of cleaning, chopping down old boards, and filling ahead of me!

Friday, 9 March 2012

Flooring Progress

I was a bit worried about the flooring as it started going in as the boards were quite rough and industrial looking in their half installed state. The carpenter even told me that he believed they were probably salvaged from a barn or old warehouse! Last night however the boards in the hallway were completed and Im really pleased with the result. I still have a step at the living room because the level difference was too great to mediate, but the other thresholds into the bedroom and WC are perfectly flush - AND Ive got rid of the annoying joint between the kitchen and hallway. I think once painted white they will look in keeping with the other boards.

Sunday, 4 March 2012

Kitchen Floorboards Removed

This weekend I spent a few hours on Saturday removing the floorboards in the kitchen, and then a few hours on sunday morning removing them in the hallway. It was harder work than expected as the boards were nailed down really tightly, but I did get better at it as I went along. It took me on average half an hour to remove each long floorboard (including knocking out the nail heads and sawing them in thirds by hand). Luckily I have a builder coming in to lay the boards in the week while I recover!

Its crazy to see how much the existing joists have sagged over the years - they have all been furred out with deep wedges of timber to achieve a level surface. I was hoping to find treasure, (or at least another old newspaper) but alas all I found was 200 years of dust and debris!

Saturday, 3 March 2012

Thames Water Trench

The freehold voted in favour of upgrading our water mains with Thames water as there is currently only one 22mm diameter line coming into the building to serve all 5 flats. Needless to say the water pressure on the top floor is very poor. My water pressure is ok, so I had voted against it, but now that its being done I am looking on the bright side and trying to feel positive. The architect who rents out the top floor has organised everything so its really nice to just have work happen without having to sort everything out myself! They started digging the trench this week.

Friday, 2 March 2012

Floorboard Setting Out

As I only have 10 boards and I want to maximise the number of long 4m runs I prepared a setting out drawing. Im lucky in that the central area I am replacing is exactly 4 boards wide so I wont have any funny thin slivers of board to deal with.