The above photo is what my living room looked like on the day I left for my holiday to Canada. The rotten timber window lintle had been replaced with a new concrete one, the window architraves returned, and the first layer of plaster applied to the walls. I only had to hope that they would do a careful paint job while I was away.
Lucky for me, the contractor doing the repair work had an excellent decorating team and after a busy afternoon with Frini spent dusting and moving everything back into place, Zen was restored once more at long last, 17 weeks after the first leak. (Thanks Frini!)
The exterior scaffold is still up, Im scheduled to do the final inspection on the exterior this coming Friday...
No comments:
Post a Comment