Monday, 21 February 2011
A breath of spring
There are already signs of spring around the neighbourhood. Snow drops are up, and blossoms are beginning to bloom. Here is a sprig I clipped as a souvenir, which Ive put in the bathroom.
Sunday, 20 February 2011
Bedroom Shutters - Part 2
I was so pleased to finally, after a year of waiting, have one set of bedroom shutters installed that it has motivated me to start working on the second pair. I have spent some time sanding and filling them this weekend, and now they also have their base coat on each side. In the detailed photo you can see how Flo has infilled the cutouts where the old hinges went with new wood. Just 3 more coats to go each side and they will be ready to hang.
Monday, 14 February 2011
Kissing Rabbits
Tuesday, 8 February 2011
Pre-Spring Flowers
I bought these bulbs last January and when they were finished I stored them away in a dark cupboard for the rest of the year. I took them out into the sunlight and warmth of the flat last month and they have just started to bloom... They seem a bit crooked compared to the first time they bloomed, but they still make the flat smell heavenly, and hint at the promise of spring.
Sunday, 6 February 2011
Bedroom Shutters In - Part 1 of 2
I have been slowly working away sanding and painting the shutters which we took down and had stripped almost a year ago today. They are grey on the inside so they match the fireplace when closed, and white on the outside so when folded into the pocket it looks like a wall panel.
We took a break from the kitchen and installed the first set this weekend. I still have two other pairs to sand and paint(the bedroom and the kitchen), but it was satisfying to get these up at last. They also help keep the draught out.
We took a break from the kitchen and installed the first set this weekend. I still have two other pairs to sand and paint(the bedroom and the kitchen), but it was satisfying to get these up at last. They also help keep the draught out.
Friday, 4 February 2011
Drawer Organisation
Wednesday, 2 February 2011
Cabinet Ironmongery in
The handles I wanted from Hafele were out of stock until mid January, so we had to wait a little while for them to arrive. Here they are installed at last. I havent removed the blue protective film yet from the cabinets as we are still slowly working on infilling all the holes made in the walls and ceiling when the electrics were adjusted and I want to wait until Ive painted.
Subscribe to:
Posts (Atom)